piloda shipyard piloda group / comunicazione piloda shipyard piloda group / comunicazione

HSC Isola di Procida (Caremar)

The specialized team of the PilodaShipyard division in Naples carried out the alignment of the propulsion system, including the main thermal engine, inverter/reduction gearbox, and propeller shaft, on board the HSC Isola di Procida (Caremar).

Read More
piloda shipyard piloda group / comunicazione piloda shipyard piloda group / comunicazione

Pontoon Tenax (70ton)

The "TENAX" pontoon wreck, a 70-ton vessel, ran aground about 50 meters from Marimisti beach while being towed for demolition. In 2022, removal began, involving careful demolition and disposal after thorough material characterization.

Read More
piloda yachting piloda group / comunicazione piloda yachting piloda group / comunicazione

M/Y Sirena 64

An elegant and spacious 21-meter trawler designed to offer comfort and long-range navigation has recently been renovated by our skilled team in our Yachting facility in Torre Annunziata.

Read More
piloda building piloda group / comunicazione piloda building piloda group / comunicazione

Palazzo Cellamare / Napoli

Piloda Building is proud to have contributed to the restoration of Palazzo Cellamare, a true architectural treasure in the heart of Naples. Originally built in the early 1500s, the palace has a rich history, having hosted figures such as Torquato Tasso and served as a lazaretto during the 1656 plague.

Read More
piloda building piloda group / comunicazione piloda building piloda group / comunicazione

Palazzo Carafa / Maddaloni (CE)

Built between 1580 and 1585 by the Marquis of Vasto, Cesare d'Avalos, Palazzo Carafa di Maddaloni is a true masterpiece of the Baroque period. The Piloda Building restoration division has breathed new life into this historic treasure through a material restoration of the façades and a high-quality pictorial intervention, achieving a result of extraordinary beauty.

Read More
piloda building piloda group / comunicazione piloda building piloda group / comunicazione

Gesac Capodichino Airport / Napoli

Two interventions were completed overnight as part of the airport terminal expansion. A massive air handling unit was lifted and positioned onto a metal structure designed and built by Piloda Building to support the new airport spaces.

Read More
piloda building piloda group / comunicazione piloda building piloda group / comunicazione

Caserma Cascino / Cagliari

A project of great historical and architectural significance carried out by Piloda Group’s Building Division at the Caserma Cascino in Cagliari, a complex with roots dating back to the 19th century. This delicate conservation-restoration work aimed to preserve the historical and architectural value of the building while respecting legal constraints and the guidelines set by the Ministry of Cultural Heritage.

Read More
piloda yachting piloda group / comunicazione piloda yachting piloda group / comunicazione

M/Y Viking 61

The Piloda Group Yachting Division recently completed a restoration project on the Viking 61, an iconic sport fishing vessel produced by the New Jersey shipyard.

Read More
piloda yachting piloda group / comunicazione piloda yachting piloda group / comunicazione

M/Y Terranova 115

The Piloda Group Yachting Division recently completed work on Terranova 115, a 35-metre shuttle with a steel hull and superstructure, characterized by a classic and elegant style.

Read More
piloda shipyard piloda group / comunicazione piloda shipyard piloda group / comunicazione

Tug Arechi

The Arechi, ship built in 2019, is a modern and versatile tugboat, operating mainly in the port of Salerno and designed to guarantee assistance with ship maneuvers, towing operations and emergency interventions.

Read More